Answer Posted / sengs darith
- The California Bearing Ratio (CBR) is a penetration test
for evaluation of the mechanical strength of road subgrades
and base courses. It was developed by the California
Department of Transportation in the 1930’s.
- The CBR is used for measuring the load-bearing capacity
for new pathways, road and airstrips or for soils already
underpaved areas. The harder the surface, the higher the
rating.
- CBR is a measure of resistance of material to penetration
of a plunger under controlled density and moisture
conditions.
...................:)
Is This Answer Correct ? | 10 Yes | 0 No |
Post New Answer View All Answers
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
What are the advantages and disadvantages of using plastic and timber fenders?
Please let me know what is the simplest way of Calculating Mix Designs
What are the applications of cad?
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
What is the compressive strength of fly ash bricks?
how to calculate the crushing strength of cement concrete paver blocks 100x100x60 mm thich.
What is the strength of cement?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
Describe a time when you anticipated potential problems and developed Preventive measures
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
Volume of 25kg putty bag & 40 kg putty bag volume??