Source (Flatfile) - Target (1-1 mapping). How to load first or
last 20 record to target?
Answer Posted / sunny
Hello joe, your solution is partially correct - what if the
records are not in sequence to do MAX minus 20 ? I guess
this logic can be applied only after passing through
sequence generator, by getting a sequence number.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
can i any one explain me realtime healthcare project explanation..for interview .iam new to informatica .thanks in advance.
What are active and passive transformations?
What is the session task and command task?
What is a connected transformation?
Is it possible to revert a global repository to local one and why?
in u flatfile some of fact records are missed then u load the diminision records are not if u load diminsion records what about fact table records
Explain the mapping variable usage example in informatica
if i hv 6 table as source table but can i make 12 as a dim table and 6 as fact table belongs to that src table.
What are the new features of informatica 9.x at the developer level?
What is a code page?
Explain load alternative records / rows into multiple targets - informatica
How do we call shell scripts from informatica?
Explain sessions and how many types of sessions are there?
Suppose we have two source qualifier transformations sq1 and sq2 connected to target tables tgt1 and tgt2 respectively. How do you ensure tgt2 is loaded after tgt1?
can anybody send me some real time screenshots of mapping in informatica powercenter. i will be vary thankful to him. my e-mail id :- prakashkumar.kumhar@gmail.com