The LCM of two positive nos is 168 and their product is 504.
what is the difference in their squares?
A. 175 B.216 C.9 D.135
Answer Posted / venukumar bn
135
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Argentina had football team of 22 player of which captain is from Brazilian team and goalie from European team. For remaining player they have picked 6 from argentine and 14 from European. Now for a team of 11 they must have goalie and captain so out of 9 now they plan to select 3 from Argentinean and 6 from European. Find out no of methods available for it. (2 marks)
There is a work which can be completed by A with 12 days and B by 18 days. A and B works together for 3 days and B left. After that how many days for A to complete the work?
Average of 5 number is -10 sum of 3 numbers is 16,what is the average of other two numbers?
Three friends divided some bullets equally. After all of them shot 4 bullets the total no.of remaining bullets is equal to that of one has after division. Find the original number divided.
What is the probability of getting 3 or 4 in 3 consecutive rolls of a dice ?
if 2x-y=4 then 6x-y is
In 6 seconds a light flashes once. In one hour how many times it will flash?
Find the value of @@+25-++@16, where @ denotes "square" and + denotes "square root".
I HAVE APPLIED FOR RRB-CHENNAI(ECRC,GOODS GUARD).SO I NEED ECRC ALL PREVIOUS YEAR QUESTION SOLVED PAPER..PLS SEND IT TO ramya.raj@hotmail.com
There are 9 coins. One of 9 is less weighted and others have equal weighed. Find the minimum no of balances to find the defective coin?
Four persons can cross a bridge in 3, 7, 13, 17 minutes. Only two can cross at a time. Find the minimum time taken by the four to cross the bridge.
A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.
Some work is done by two people in 24 minutes. One of them can do this work alone in 40 minutes. How much time does the second person take to do the same work ?
Hello My name is vijay right now I'm preparing for SBI po, I am good at aptitude but not better. I am lagging time you know competitive exams are to answer in span of time. So any website regarding aptitude short cuts or tricks Pls post to my mail. I am waiting
A works thrice as much as B. If A takes 60 days less than B to do a work then find the number of days it would take to complete the work if both work together?