WHICH TYPE OF TRANSFORMER USED IN SWITCHYARD IN POWER PLANT?
Answer Posted / dileep kumar
step up transforrmers because of long transmission
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
Can any one provide the inspection procedure of MIMIC for VFD panel? Details: If someone wants to have a mimic in the VFD panel what are inputs considered for the mimic(like on,off,trip) whether we are able to add speed variation in the mimic(if so how can we get) and what are the parameters to be checked in the MIMIC during inspection?
what is difference between isolation and ultra isolation transformer?, what is the method of testing ?
what is the purpose of bypass mode in energy lighting transformer?
what's producer of XLPE cable laying in undergroung
when measure the core loss of three phase distribution transformer or three phase reactor loss, one phase shown negative watt loss. why??
Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.
working of diesel generator ?
WHAT IS THE DIFFERENCE BETWEEN GENERAL INVERTER AND SOLOR INVERTER TELL ME PLZ
If there is major % of Voltage harmonics in the system, how can it be control or reduced?
Write the analogous electrical elements in force voltage analogy for the elements of mechanical translational system.
What is the best thing to protect the motor from running over full current. CT or O/L or pressure transducer at the given pressure rating
Can anyone tell the proper diagram of star delta starter????
how calculate the electrical load for industry and office
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
what you have to see after one week or month from the day of installation of transformer ?