what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.
Answer Posted / pankaj
1 vertical to 30 horizontal
means moving 30 units horizantaly when we moving 1 unit verticaly
| Is This Answer Correct ? | 20 Yes | 3 No |
Post New Answer View All Answers
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai
Which purpose we use deck anchor in bridges?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
how to calculate spacing rod in column
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
What in bending moment, if a moment is free end of cantilever beam?
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
What is an object snap mode?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
construction workers how much time take one work or qty
what is mean by c32/40s concrete class
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)