what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.

Answer Posted / pankaj

1 vertical to 30 horizontal
means moving 30 units horizantaly when we moving 1 unit verticaly

Is This Answer Correct ?    20 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I what know about life time of frp tank plz explain about it specifications & other details

1781


List out some of the software used in the construction sector to estimate cost and monitoring expenses?

713


what else we can add rather than admixture in concrete to reduce the cement quantity?

5307


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

1791


How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?

1186






why we use 19x9x9and 20x10x10 but not other

1727


what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????

1646


What is modular elasticity?

715


Explain moment of inertia?

640


How many cum of 9.5mm stone in 1 ton ?

2092


Why should pumping be not used in case of concreting works?

984


What are the advantages of building a dam on the river nile?

630


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2023


How to calculate the area in squarefeets ?How much area of sqft for this measurements?East 53.3ft West 54ft North 47.7ft South 51.1ft ?

1433


Explain why concrete barriers have curved surface profiles?

813