Why attemperation is required in HRSG in a combined cycle
power plant?
Answer Posted / sitaram singh .bonduli
As the steam generated in HRSG shall be routed to the main steam pipeline of steam turbine , it should meet the design criteria (Design temp) hence The attemperation serve the purpose when Rapidly varying load conditions takes place.
| Is This Answer Correct ? | 10 Yes | 3 No |
Post New Answer View All Answers
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
How do you consider that you can improve and what assistance do you need to achieve this
what is the basic use of power plant in equipment
why airtel use + 24 volts and other operators use -48 volt
explain how the third harmonic content of the magnetising current affects transformer design
How We Calibrate the vaccum transmitter?
what is the trip circuit supervision in an electrical meaning?
How to calculate power press toneage
what does mean by kva rating
What is LB-SR.
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor
can dp type level transmitter work in under vaccum condition
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525