Why attemperation is required in HRSG in a combined cycle
power plant?

Answer Posted / sitaram singh .bonduli

As the steam generated in HRSG shall be routed to the main steam pipeline of steam turbine , it should meet the design criteria (Design temp) hence The attemperation serve the purpose when Rapidly varying load conditions takes place.

Is This Answer Correct ?    10 Yes 3 No