Why attemperation is required in HRSG in a combined cycle
power plant?
Answer Posted / jayanta madhab
Attemperation required to protect costly superheater and
evaporator tubes from overheating during flue gas
temperature variation.
Is This Answer Correct ? | 3 Yes | 8 No |
Post New Answer View All Answers
LAPT working in alternator / generator
what is the meaning of SST300 V56A in SIEMENS turbine
what is the trip circuit supervision in an electrical meaning?
why do you consider yourself a suitable candidate for this position
By any way can we increase the B check hours from 300 to 500
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
explain how the third harmonic content of the magnetising current affects transformer design
why airtel use + 24 volts and other operators use -48 volt
procedure of how to generate power in solar plant.
What is LB-SR.
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
can dp type level transmitter work in under vaccum condition
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
what is the difference between compensated & normal drum level in boiler drum?
How to calculate power press toneage