Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

A group of machines (wind turbines) connected with 33KV
feeder and each machines are having individual VCB. The 33KV
feeder connected with 110KV/33KV substation. The 33KV feeder
tripped by over current at Substation and fault recorded at
Substation as OC-R&Y phase. Same time the group of machines
VCB tripped by over voltage, the fault recorded voltage was
above 66KV by numerical Under/Over voltage relay. While grid
drop time, this much of voltage hike is possible?

Answer Posted / k.prakashchandra

The load throw-off may result in run-away speed being equal
to twice the normal speed ,hence the voltage may also become
twice. Over voltage relay should be set at not more than
120%.You can employ the AVR so that the voltage does not
increase with the speed.

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Air refrigeration cycle works on the

1102


sir, 3phase induction motor takes different pf and different KW in three phase while running,explain reason

1482


actually i can't understand what is 3dB ? and it's really not clear to me.please any one let it me be cleared.

2257


what is 30-phase of transformer

2309


What is meant by coupling capacitor?

1077


how can i get the formula to find out the cable size if i know the load of main fuse protection.

1941


how to select the isolation tranformer for siemens 802dsl cnotroller

2069


what the function breaker failure scheme, how is it operated

1915


how to calculate the tarriff for an industry whose kva demand is 10 mva

1994


I am designing new project sub station with 220 kV / 11 kV, 40 MVA capacity. This project have many recifier sets, which can generate 3rd harmonics. Now I have to select vector group of This transformer. To minimise 3rd harmonics, what care should I take in selection of Transformer Vecrtor group? If it is Y-Y with open Delta tertiary then what should be the rating & voltage of Tertiary Winding?

1876


hi friends if you have any 400KV Substation Erection and installations Drgs please send to me.My email id:kandi.suresh441@gmail.com

2922


How many size of cable required for a 300m long and 30kw inductive lode

1312


What is speed mode?

1723


what are types of encoder

1879


Why power genaration in India is at 50HZ while America its 60HZ

2290