Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why there is no grow of grass under the high voltage
transmission line?

Answer Posted / satis garnayak

dear sir, but my question is why no grow of grass under hv transmission line not in grid station..so plz kindly tell

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What will be electrical cost per sqft for IT building (basebuild and fitout)and for residential township?

1990


Dears we deal in Chemical are Plate earthing. Kindly call if any requirement and questions. Tech Earth Solutions Mohit Verma 8791071007

1915


Meaning of ingrace protection for motor.for ex IPXY

2982


If we have 11 kv RYB Phase single core cable near about. Then wht effect and losses

1934


If not into production, how far did you follow the design and why did not you see it into production?

2225


Why is it prefer to initiate circuit breaker failure by "86" lockout relay not by "94" tripping relay ?!

1843


Assuming that a dedicated neutral earthing transformer is provided for each GT generator, when the two generators are running in parallel, has consideration been given that the earth fault current from one generator stator winding be split between the two neutral earthing transformers? If so, what adverse impact will this have on the operation of the 59N and 27TN devices?

1714


Why power genaration in India is at 50HZ while America its 60HZ

2336


What is Meter MF if External CT Ratio is 150/1 , PT Ratio is 132/110 Meter CT Ratio is 200/1 & Meter PT Ratio is 110/1

1960


Why Utility Distribution System in India is mainly at 11 kV? Why not Utility go for 33 kV?

1787


what the function breaker failure scheme, how is it operated

1957


what is the difference between rectifier and converter and commudator?

2013


What is the maximum and minimum rating of UPS?

1579


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7771


concept of busbar and load dispatching..?

2496