what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.
Answer Posted / saif
this is refer to slop, 1 stand for vertical & 30 or 40 stand for horizontal.
Is This Answer Correct ? | 39 Yes | 1 No |
Post New Answer View All Answers
Why should appointment store person for project ? what is the benefits for company ?
How to take labor charges for construction of 1cum of concrete?
Why should you show Client/Engineer activities clearly on the project plan?
What are the RISKS during the project construction?
how to calculate MR 9(derivation)
what are the values of compressieve strenght?
What is the difference between yeild strength and compressive strength of steel???
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
what is the Asfalt test?in road constraction..?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
Doul Bar reinforcement and details of drawing.
Which is the best book for building construction?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
what is the tensile strength of 10swg and 8swg gabion wire?