what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.

Answer Posted / saif

this is refer to slop, 1 stand for vertical & 30 or 40 stand for horizontal.

Is This Answer Correct ?    39 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why should appointment store person for project ? what is the benefits for company ?

611


How to take labor charges for construction of 1cum of concrete?

670


Why should you show Client/Engineer activities clearly on the project plan?

1944


What are the RISKS during the project construction?

1728


how to calculate MR 9(derivation)

2308






what are the values of compressieve strenght?

1587


What is the difference between yeild strength and compressive strength of steel???

1780


If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US

1290


what is the Asfalt test?in road constraction..?

1640


How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

4494


Doul Bar reinforcement and details of drawing.

1916


Which is the best book for building construction?

644


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1647


how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail

3483


what is the tensile strength of 10swg and 8swg gabion wire?

1552