what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.
Answer Posted / saif
this is refer to slop, 1 stand for vertical & 30 or 40 stand for horizontal.
| Is This Answer Correct ? | 39 Yes | 1 No |
Post New Answer View All Answers
construction workers how much time take one work or qty
How much cement and water required for cement selery????
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
what is pqc
In the roof of a pumping station explain briefly the components of a waterproofing system?
Test procedure of fly ash bricks as per code ?
What is thumb rule in quantity and cost estimation of a residential building?
what is raft foundation
trapozidal
What year was the keystone power plant in Indiana County constructed?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.