what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.
Answer Posted / saif
this is refer to slop, 1 stand for vertical & 30 or 40 stand for horizontal.
| Is This Answer Correct ? | 39 Yes | 1 No |
Post New Answer View All Answers
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
Explain the different types of building contracts?
What is the difference between linear dimension and aligned dimension?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
How you can turn off the display for dimension in CAD?
what is the method used for marking of cantilevers in hirise buildings by using theodolite
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
Which is the direction of negative angle?
What is Gsb tollens ?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
what is the price of a cubic meter of concrete on international market?
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
Why steel rods are produced only in even dimensions?
For fine aggregate which is most suitable River sand or crusher sand & why ?