what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.

Answer Posted / nikhil

i know that but what does the numbers signify?

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1423


How to find out slope footing concrete

2420


what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?

1740


PL.tell me about civil engineering questions with answer

2109


How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?

1695






what is the hanekom repairing material after concreting work

1912


What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)

3780


What is meant by cartesian coordinate system?

702


hi guys what happens if you are absent for a supplymentry exam?

1371


a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing

2791


How to calculate the crank rod in slab

1887


hai, kindly send anyone for output workers format details for construction project in foundation to finishing.

1063


Define What is Civil Engineering?

651


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.

1783


indian standard split spoon sampler

1543