what does 1 in 30 or 1 in 40 mean when constructing camber
in roads.
Answer Posted / n rajesh guttedat
That is slope maintain in camber construction
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
what would be the design load of R.C.C Cooling tower per cell.?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
why we use 19x9x9and 20x10x10 but not other
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
Soil bearing capacity formula
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
How to find out kg per Sft ?
what are the changes in concrete pour height as per IS 456, 2009?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
What is the purpose of the gap in the road on this bridge?
what does the track parameter mean in staad.pro?
What things you need to take care of before building a kitchen island?
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?