How do we come to know the Source data/file is
ready/Updated in the source location, when the session is
scheduled for @12:00AM and ready to run its job ? or Can we
schedule the session, when the source is updated in source
location without any time constraint?
Answer Posted / dr
It all depends on the Organisation to Organisation which
uses different softwares (Control-M is one of them). The
job will be triggered based on the notification message
= 'Y' when the Source file is ready or else it will have a
status = 'N'.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
How do you load only null records into target? Explain through mapping flow.
How do you update the records with or without using update strategy?
What is the difference between power center and power mart? What is the procedure for creating independent data marts from informatica 7.1?
What is olap (on-line analytical processing?
How many transformations can be used in mapplets.
Define enterprise data warehousing?
Dimension Object created in Oracle can be imported in Designer Cubes contain measures
Can you generate sequence numbers without using the sequence generator transformation?
what is the complex transformation you used in informatica
How to do the error handling of if ur source is flatfiles?
What is xml source qualifier transformation in informatica?
What is the difference between STOP and ABORT options in Workflow Monitor?
EXL informatica Questions
What happen if you have 3 ports in SQ and 4 ports in SQL override of SQ( provided all ports are in same order and they are connected with proper source and target)? Also what happens when I have 4 ports and will extract 3 values in SQloverride.. What will be the value in 4th port ?
What are the tuning techniques you applied during your last project