If process order is technically closed, by mistake
I want to process that order again can I do it?
Answer Posted / shivshankar
yes u can do Posting even if order is TECO.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is Individual and collective requirements and differecne between them in MTO scenario?
Why the work scheduling view is required for semi-finished and finished products?
• How are basic order dates determined?
Mention what are the types of master views for production and planning?
Checkdigit example
Explain source inspection.
Explain Availability check.
What is MRP Area or How can I excluede one storage location stock from MRP?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
Explain Planning file entry.
What is scope of planning?
Can't one material be assigned to more than one operation in a routing?
Can any body explain me why work scheduling view is required for semi finished and finished products?
Define mrp controller
Explain Flexible Planning procedure or How many levels of Flexible planning.