adspace
can u plz send me ntpc placement papers(civil engineering)
at munjalricha1988@gmail.com and which types of questions
are aked by ntpc
Answer Posted / lokesh mishra
I too need it...if u find it then also send it to me at
lkshmishra@gmail.com
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
plz.show development and anchorage length in simple diagram.
what is the 0 value in quantity surveying
please send me bhel questions on rupesh.017@rediffmail.com
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
material used for mendrel use to bend epoxy coated rebar
i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
what is the difference between replacement of cement by groundnut shell ash
400 ku d/c clearess ketan hota hai?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?