Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAR IS DIFFERENCE BETWEEN NOMINAL MIX & DESIGN MIX IN
DETAIL

Answer Posted / elanthendral m.

Nominal mix concrete may be used for concrete of M 20 or
lower. The proportions of materials for nominal mix
concrete shall be in accordance with table no 9 (IS 456-
2000). above M20 grade we have to go for mix design
produces as per IS 10262-2009

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Use of coping on terrace wall and in 4" wall is compulsory or not ?

1562


100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags

2371


What is Time period of a building and its relation with frequency ?

1363


What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.

2088


1m square 20mm plastering how much of water need curing work

1849


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

2089


How to calculate carrying capacity of the existing water supply trunkmain

2242


design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal

2186


Why is concrete cube test carried out?

1187


How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....

1925


GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.

2450


What is meaning of tlc

2021


how we calculate the grade of the Bituminous materials.?????

2244


what is the clear cover for shearwall?

1532


How to find out kg per Sft ?

2240