Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

in which journalling which attributes are necessary

Answer Posted / raheem

1.CRTJRNRCV
2.CRTJRN
3.STRJRN
4.STRCMTCTL
5.DECLARE A FILE WITH COMMIT KEYWORD
6.ENDCMTCTL
ABOVE OPERATIONS ARE DONE IN A CL PGM WITH THE USE OF PF,LF

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

When it is desirable to describe files Internally?

1690


can I touch the array during treatments?

1151


can anybody help me to solve this problem. the program that i m checking display error message saying "Record format for file AJDSPFFD does not match model file and decimal error. how to solve this problem. The AJDSPFFD is snapshot the AJTLOG that is the audit trail list.

2782


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

2241


What is difference between bind by copy and bind by reference?

2450


what is an online rpg?

1241


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

1234


Explain mdt?

1109


what is data area and how it is used in rpg program ?

1306


Suppose we have one database file and it is used by 5 programs and in 3 program we have to add some records in datbase file s what is the impact on other program?

1903


what do you mean by an input subfile, what are the keywords required?

1239


What is the purpose of record level identifier?

1111


explain sflclr, sflend, sfldlt, and sflcsrrrn?

1336


How to write record if no field or the field are different in physical file in rpgle ?

946


how do I play {insert rpg system here}?

1018