how much quantity of cement and sand required for
construction of 10 cum brick work( Brick size
3"*4"*9"(Standard size ) an d for 10 cum construction of SSM
(Size stone masonary) with Cm 1:6 for both.
Answer Posted / jocky
mortar required for 10 cu.m brick work
Dry mortar = 30% of brick work = 3 cu.m
one part of cement=3cu.m/sum of proportion
(3/1+6)=0.428cu.m
cement required in bags...0.428/vol. of one bag of cement
(0.428/0.035) =12.23 bags ..take 13 bags of cement
sand = 0.428*6= 2.57 cu.m
| Is This Answer Correct ? | 24 Yes | 10 No |
Post New Answer View All Answers
how to calibrate the RM 800
How to plan a project
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
how to absorb to site basic corrections? which are the important correction?
rate analysis for cement pointing 1:4 , for 100 sq m
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
how u design STAGING for Superstructure in BRIDGE construction?
Which is the latest version of solidsworks?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
how we calculate the vol.of wet concrete..?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
what is difference between fluidity and workability also how palsticizer works
what is the service corridor?