mortar required for 10 cu.m brick work
Dry mortar = 30% of brick work = 3 cu.m
one part of cement=3cu.m/sum of proportion
(3/1+6)=0.428cu.m
cement required in bags...0.428/vol. of one bag of cement
(0.428/0.035) =12.23 bags ..take 13 bags of cement
sand = 0.428*6= 2.57 cu.m
| Is This Answer Correct ? | 24 Yes | 10 No |
Post New Answer View All Answers
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
Can a wave happen in the middle of the ocean like in the movie poseidon 2006?
How to calculate quantity of plum masonry in 1:3:7
What is difference between combin footing & rapt footing
What are the basic use of runners and standards of pipelines?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
Explain the latest method to detect a crack in a building?
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
How does a traffic light signal work ?
What is meant by solid geometry?
Before casting a basement roof slab which is connected with retaining wall surcharge load (i.e. sand or earth filling) outside the retaining wall is prohibited because of––
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)
What is critical path method (c.p.m)?