how much quantity of cement and sand required for
construction of 10 cum brick work( Brick size
3"*4"*9"(Standard size ) an d for 10 cum construction of SSM
(Size stone masonary) with Cm 1:6 for both.
Answer Posted / jocky
mortar required for 10 cu.m brick work
Dry mortar = 30% of brick work = 3 cu.m
one part of cement=3cu.m/sum of proportion
(3/1+6)=0.428cu.m
cement required in bags...0.428/vol. of one bag of cement
(0.428/0.035) =12.23 bags ..take 13 bags of cement
sand = 0.428*6= 2.57 cu.m
Is This Answer Correct ? | 24 Yes | 10 No |
Post New Answer View All Answers
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
how much need sand and cement for 1 cft roof construction?
How to determine thee cut length for steel reinforcement bars in R.C.C design
suppose we have a tendency to make a hole on the surface of the simple supported beam, than where we goes to make it?
Explain major difference between auto level and dumpy level?
use ofr concrete as per grade ?
all technical question
what is the difference between np2 and np3 concrete mix
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
What is the strength of 1:6:12 mix?
what pressure the NP2 class RCC pipe can sustain?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
How to hide dimensions in autocad?
How to do bbs in excel format