how much quantity of cement and sand required for
construction of 10 cum brick work( Brick size
3"*4"*9"(Standard size ) an d for 10 cum construction of SSM
(Size stone masonary) with Cm 1:6 for both.
Answer Posted / jocky
mortar required for 10 cu.m brick work
Dry mortar = 30% of brick work = 3 cu.m
one part of cement=3cu.m/sum of proportion
(3/1+6)=0.428cu.m
cement required in bags...0.428/vol. of one bag of cement
(0.428/0.035) =12.23 bags ..take 13 bags of cement
sand = 0.428*6= 2.57 cu.m
| Is This Answer Correct ? | 24 Yes | 10 No |
Post New Answer View All Answers
what is the hanekom repairing material after concreting work
undistributed samples are obtained by
Describe the sections included in a typical bill of quantities
What is the meaning of soil reinforcement?
Why M15 is replaced by M20 when ammendment are made in IS456 in 2000?
What is difference between combin footing & rapt footing
explain the rale of the government in the construction industry
Explain different types of rcc pipes.
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
how to find ssm in foundation?
What is labor and material payment bond?
How can you achieve soil enforcement?
pls tell me about method of cutting length of ties column