A company requires 11,500 strength.present employees are 200
women , men and 6500 unmarried To reach the target how many
women required to maintain the same ratio?

Answer Posted / guest

2300

Is This Answer Correct ?    2 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

No of financial emergency announced by president

2053


Please provide me rs aggarwal verbal reasoning book link pleeeeeeeez

869


A clock is late by 1 minute 27 seconds in a month. Then how much will it be late in 1 day?

1170


Find the speed of the boat in still water if the river runs at 4 km/hr. The time taken by a Suresh to row the boat upstream is 3 as the time taken by him to row it downstream.

889


all apscsc question papers

2024






500 men are arranged in an array of 10 rows and 50 columns . ALL tallest among each row are asked to fall out . And the shortest among THEM is A. Similarly after resuming that to their original positions that the shortest among each column are asked to fall out. And the longest among them is B . Now who is taller among A and B ?

829


There are A,B techers and C,D doctors.Find the possible no of combinations that should not be repeated more than once?

819


A shopkeeper bought a watch for Rs.400 and sold it for Rs.500.What is his profit percentage?

1059


Find the next series number 1, 1, 2, 3, 6, 7, 10, 11, ?

720


Rakesh buys 1 gallon of milk for Rs.12 and mixes it with 20% water. He then sells it for Rs.15, What is the percentage of gain that Rakesh would get.

717


what types of question tricom will ask

1629


The ratio of the length : breadth : height of a cuboid is 5 : 4: 3, and the volume is 7500. What will be its surface area ?

817


A mall installed 36 cctvs at the beginning of the year. In March they installed 9 additional cctvs and then disconnected 18 in August. How many were still installed at the end of the year.

773


inept : clever :: languid :

701


A team of 200 wagers undertakes building work of a bridge. The total time allocated to build the entire bridge is 20 days. After 10 days since start, 200 more wagers join the team and together the team completes the bridge in required time. If the original team do not get those 200 extra wagers, how many days they would be behind schedule to complete building the bridge.

1038