what is difference between migration project and integration
project? can anyone explain with the example
Thanks in advance

Answer Posted / d anil babu

hi this is anil.
migration project means already developed project developing
with another tool for same purpose
ex:informatica to datastage

integration:two or more projects intigrate to single project
for one purpose

Is This Answer Correct ?    6 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How the ipc stage work?

670


What are some different alternative commands associated with "dsjob"?

649


what is the use of surogate key in datastage

1814


Differentiate between Symmetric Multiprocessing and Massive Parallel Processing?

617


Describe the architecture of datastage?

568






CHANGE CAPTURE

889


What are the types of containers?

685


How will you load you daily/monthly jobs datas in to Fact and Dimension table using datastage.

2987


Define project in datastage?

660


what is repositery?

1293


What are orabulk and bcp stages?

645


How one source columns or rows to be loaded in to two different tables?

657


What is the precedence of stage variables,derivations, and constraints?

594


What is the difference between datastage and informatica?

609


what should be ensure to run the sequence job so that if its get aborted in 10th job before 9job should get succeeded?

953