A starts from a place at 11.00 am and travels at a speed of
4 kmph , B starts at 1.00 pm and travels with speeds of 1
kmph for 1 hr , 2 kmph for the next hr , 3 kmph for the
next hr and so on. At wht time will B catch up with A ?

Answer Posted / guest

at 10.00 pm

Is This Answer Correct ?    1 Yes 11 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i want rrb tc exam previous pepers

1959


Q.19 Alok and Bhanu play the following min-max game. Given the expression N=9+X+Y–Z where X, Y and Z are variables representing single digits (0 to 9), Alok would like to maximize N while Bhanu would like to minimize it. Towards this end, Alok chooses a single digit number and Bhanu substitutes this for a variable of her choice (X, Y or Z). Alok then chooses the next value and Bhanu, the variable to substitute the value. Finally Alok proposes the value for the remaining variable. Assuming both play to their optimal strategies, the value of N at the end of the game would be 27 18 20 Answer is: 20 can someone plzzzzzzzzz tell me how this answer is calculeted???

2463


How many ewes (female sheep) in a flock of 50 sheep are black? 1. There are 10 rams (male sheep) in the flock. 2. Forty percent of the animals are black. statement 1 alone is sufficient, but statement 2 alone is not sufficient to answer the question statement 2 alone is sufficient, but statement 1 alone is not sufficient to answer the question each statement alone is sufficient statements 1 and 2 together are not sufficient, and additional data is needed to answer the question

3566


a circular track has 100yards. The race of Rabbit and TOuttoise. they started at same point. and move in circular path. in opposite direction.first tortoise run for 1/8 th path, then only rabbit starts,rabbit moved slowly till tortoise meet him, Rabbit had covered 1/6 th distance speed( over earlier speed) to win

920


A finishes a work in 12 days and B finishes same work in 14 days.If they work for a day alternately with A beginning, how many days will it take to complete the work?

686






sir am writing aso(assistant statistical officer) exam first time, so please send me previous papers, and syllabus. my optional subject is statistics

1691


be * be = acb a,b,c,e are non zero numbers find b,e.

868


Four persons can cross a bridge in 3, 7, 13, 17 minutes. Only two can cross at a time. Find the minimum time taken by the four to cross the bridge.

842


(Momentum*Velocity)/(Acceleration * distance ) find units.

711


two bowls are taken, one contains water and another contains tea equal amount . One spoon of water from 1st is added to second bowl and mixed well, and a spoon of mixture is taken from second bowl and added to the 1st bowl. Which statement will hold good for the above?

1720


If a square is formed by the diagonal of the square as an edge, what is the ratio between the area?

1041


Number of digits with a 2 in them between 100 and 400?

773


Argentina had football team of 22 player of which captain is from Brazilian team and goalki from European team. For remaining player they have picked 6 from Argentinean and 14 from European. Now for a team of 11 they must have goalki and captain so out of 9 now they plan to select 3 from Argentinean and 6 from European. Find out no. Of methods available for it

847


Every day a driver comes to pick up a man at his office at 6pm. One day the man gets free early and rather than waiting for the driver, he starts walking for home at 4:30pm. The man meets the driver on the way and then reaches home 30minutes earlier than usual. What is the usual time that man takes to reach home from the office?

815


A person runs 6 ft in 1/4 sec. how much it will run in 10 sec. ans 240

3528