Answer Posted / sanjay verma
GENTERY,TWO OVER HEAD EARTH
POLE,L.A.,PT,CT,METER,ISOLATOR,CT,PT,POSTINSULATOR(FOR
REQUIRED),LA,TRANSFORMER,ONE OVER HEAD EARTH POLE,YOUR
SECONDERY CONNECTION. EACH EARTH POLE ARE CONNECTED IN SUB
STATION BASED EARTHING.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
what about the power of wattmeter at starting and loding?
How work of capacitor in dc supply...???
What happen Grid EARTH plat got cut.
defination of transistor controlled series capacitor
thyristor controlled APFC panel design parameter?
I want single line diagram for AMF & DG syncronizing panel
what is (+) and (-) in generator field detector stand for?
The screw thread commonly used for transmission of motion is one of the following types of threads
The advantages of Magnetic flux leakage technique over Ultrasonic technique for non distructive testing of material.
How much should be the load percentage for 15kva Inverter and Iinut & I output load with Calculations
what is JE exam?
how to select electrical equipment such as fuse,dg,transformer,motor,msb,wire,cable as per the connecting load..please mention any books to design,take licence
how can we save enegry by using VFD for Resiprocating Air compressor which is having more unloading running hours
Why is back emf used for a DC motor? Highlight its significance.
What is the comparison between 30mA DP RCCB and 100mA DP RCCB and can replace it against 63A MCB