Answer Posted / sanjay verma
GENTERY,TWO OVER HEAD EARTH
POLE,L.A.,PT,CT,METER,ISOLATOR,CT,PT,POSTINSULATOR(FOR
REQUIRED),LA,TRANSFORMER,ONE OVER HEAD EARTH POLE,YOUR
SECONDERY CONNECTION. EACH EARTH POLE ARE CONNECTED IN SUB
STATION BASED EARTHING.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how to select battery for 15 KVA UPS with formula
what are all types of cross section in AC cables?
power transmission pole used one support , that only for support or earthing
why occ characteristics curve in not tracing back when we are bringing back the rhoestat?
what do you mean by class PS CT and what are technical details needed for calculating it?
What happened if C.T mount at any cable or Bus bar in wrong direction . C.T going on proper work or not . C,T direction is essential thing to properly work.
What is the tension required for the 25000 CFM AHU belt
What is Surge Capacitor? Why it is require in Generator Circuit Breaker,inspite of surge arrester?
Why High voltage are generate noise ?
given data are load current & power factor cable core size? plz any one update the calculation formula
Why the frequency of ac in india is 50 hz but in some other countries it is 60 hz.
Sate maximum power transfer theorem?
as a electrical student why should i hire you?
why surge protectetor work explain with the help of circut diagram?
In a carnot engine with an efficiency of 40%, the heat rejected to the sink at 27 C is 60 kJ, then the heat supplied in kJ to the engine by the sources is