how to calculate concrete quantity for footing using M25 grade
1:1:2 for 730cft.
Answer Posted / kuldeep singh sevariya
dry quantity of 1 cum wet concrete =1.54
730cft=20.67cum of wet quentity
so,dry quentity of 20.67cum=1.54*20.67=31.83cum
CEMENT=(31.83*1)/(1+1+2)=7.96cum
(Density of cement-1440kg/cum)
(7.96*1440)/50=229.176Bags
SAND=(31.83*1)/4=7.92CUM, SO, 1600*7.92=12672 KG
AGGREGATE=(31.83*2)/4=15.92 CUM
SO,1520*15.92=24198.4 KG
| Is This Answer Correct ? | 14 Yes | 3 No |
Post New Answer View All Answers
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
What is quantity of cement and sand required for 2000sqft of tiling?
Technical Question of Civil Engineering
can i get civil engineering test papers.......?????
How is the leaning tower of pisa supported?
TELL ME THE EQUATION FOR OGEE SPILLWAY
afe or not
why top layer of block work shoud be full size if any cut block adjustable than another layer?
What are the problems one might face while having a Cantilever balcony?
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
What will you do if you encounter problems like accidents?
How to make a c++ program that converts any base to base 10?
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
what is the minimum compressive strength of clay brick
specifications of fe500 steel