how can we know running job is batch or intractive ?
i need all the possibilites.........plz help me

Answer Posted / mathankumar

we know running a job is batch or intractive by using
WRKACTJOB Command.

Is This Answer Correct ?    5 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can we know running job is batch or interactive?

645


How to write record if no field or the field are different in physical file in rpgle ?

478


Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?

507


How would display prime numbers using CL program?

5668


Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.

2045






Explain mdt?

657


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

1553


How to select highest score of each subject or how to select highest income of every month?

1285


How to handle duplicate error handling in RPG?

1668


what is the procedure and explain about real time scenario.

1471


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1754


what happens when sflsiz = sflpag? What are the advantages and disadvantages?

706


How to call one program from another program in RPG? please help me with the code

1250


We have job which is running as batch. It takes atleast 06 hours to complete tht job. But I wanna do tht job with in 3 hours?

757


What is file identifier where we can use?

637