adspace
What is the exact meaning for under & over reinforced beams
& when they have to used..
Answer Posted / abhinay barla
when the permissible stress is less than the maximum permissible value then it is said to be under reinforced section/beam.
when the permissible stress is grater than the maximum permissible value then it is said to be over reinforced section/beam.
when the permissible stress is equal to the maximum permissible value then it is said to be balanced reinforced section/beam.
| Is This Answer Correct ? | 39 Yes | 8 No |
Post New Answer View All Answers
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
HOw much % of premium on DSR-2013 currently
what is the 0 value in quantity surveying
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
how can we calculate steel value, depending on load
plz.show development and anchorage length in simple diagram.
please send me bhel questions on rupesh.017@rediffmail.com
Technical Question of Civil Engineering
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com