how to calculate concrete quantity for footing using M25 grade
1:1:2 for 730cft.
Answer Posted / ramakrishna
cement-232 bags
sand-12.9tons
metal-570cft
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
Explain what is 1/8 on the architect ruler denotes?
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
How will be cutting in timber plate size 600*400 column size
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
What glue is least sticky?
Differentiate first angle & third angle projection?
What is unit weight of normal concrete?
What is a projection line?
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
Difference between pre-tensioning and post-tensioning.
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
For The preparation of goverment examination Which book i will prefer and by which way i will do the preparation for exam.
What is the difference between linear dimension and aligned dimension?
For making a new road in a village having a school & hospital , tell the steps of construction systemically ?
why is M25 and Fe 500 assumed to be most economical? i feel it is not.This is because higher grade of concrete and steel has higher lapping length and anchorage length compared to lower grades..