WHAT IS BASICS TO SELECTION OF 11 kv Trasformer, send any
calculation sheet for selection of transformer
Answer Posted / shiva
for any application selection depends on local distribution
(sub station ) transmission ,secondary voltage and finally
depends only on demand KVA of u r plant.
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
what is ratio of copper wire size and current ?
Why DG set is not installed in Terrace ??
What types of question are done for diploma students in aptitude test
What is the form name of 'c' license, I want to download in web
How to decide the size of the capacitor for a single phase induction motor say 2 HP ??
What are the two segments of nyquist contour.
All the socket in a room become very hot, the Wall was also became very hot and the earth conductor also became live, what in your view might be the possible causes?
What will be the diameter of pipe between conservation tank and transformer
What is Load sharing of Transformer ?
What is the theoretical reason for the size of a zig zag grounding transformer to be 1.732 times less than that of a wye-delta grounding transformer used for the same application?
what is sevice settings for mccb?How can be it setted?
What is Servo Ventilated Motor?
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
If we want to change a contactor of faulty one what are the conditions want to fullfil
can u please mail me the syllabus for GET exam for damodar valley corporation?