Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

WHAT IS BASICS TO SELECTION OF 11 kv Trasformer, send any
calculation sheet for selection of transformer

Answer Posted / shiva

for any application selection depends on local distribution
(sub station ) transmission ,secondary voltage and finally
depends only on demand KVA of u r plant.

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is ratio of copper wire size and current ?

1876


Why DG set is not installed in Terrace ??

1278


What types of question are done for diploma students in aptitude test

1715


What is the form name of 'c' license, I want to download in web

1942


How to decide the size of the capacitor for a single phase induction motor say 2 HP ??

2311


What are the two segments of nyquist contour.

1163


All the socket in a room become very hot, the Wall was also became very hot and the earth conductor also became live, what in your view might be the possible causes?

1703


What will be the diameter of pipe between conservation tank and transformer

1973


What is Load sharing of Transformer ?

2077


What is the theoretical reason for the size of a zig zag grounding transformer to be 1.732 times less than that of a wye-delta grounding transformer used for the same application?

2326


what is sevice settings for mccb?How can be it setted?

2295


What is Servo Ventilated Motor?

2097


(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)

1910


If we want to change a contactor of faulty one what are the conditions want to fullfil

2043


can u please mail me the syllabus for GET exam for damodar valley corporation?