Cube tests of concrete are failed at 7 days and 28
days.What is your next action?
Answer Posted / vimalsekar
Well. When Concrete cube test result fails at 28th day then
go for concrete core cutting and check the compressive
strength in it. Number of cores shall be as per the
engineer incharge's decision but should not be less than 3
nos. IS:456 says if the core test fails then go for load
test. IS : 456 also says that NDT can be done . But with
rebound hammer test only surface hardness will be known and
hence this test result is not reliable and hardly anyone
suggests for this test.
| Is This Answer Correct ? | 18 Yes | 3 No |
Post New Answer View All Answers
what is the function of GSB all class ?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
What are the advantages and disadvantages of lead products in construction?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
how to calculate valuation for the old building?
1m square 20mm plastering how much of water need curing work
pls give me some basic informations in construction of a structure?
IS code for grade of concrete for bamboo lintel????
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
What is the difference between Fe 500, Fe 500 D and Fe 515.
Whats the meanig of ,'K' VALUE in the case of soil.....
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing
Define Workability ?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)