Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Why we didn’t feel electric shock in an electric train ??

Answer Posted / kaji mustufa

As the source used in trains is from overhead lines and it makes contact with PENTOGRAPH contactor but pentograph contactor is insulated from coaches by mounting insulator discs on the top of train..
summerising, electric train and source (i.e. 25kV dc) is electricaly not connected.. Hence no shock....

Is This Answer Correct ?    7 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How can we measure the residual voltage in dc machines?

1856


whats the application of voltage regulation? and whats the voltage regulation's device?

1885


Sir, My doubt on cable sizing calculation, Load:74 KW calculated cable 1 run 50mm2. Now client asking us to reduce cable size by increasing runs. Sir, My question now when my mind strikes with 2 options 1) Divide load 74/2 = 36 and calculate cable for 36+36 making it 2 runs or 2) Simply i can divide 50mm2 /2 ie. 2 runs of 25mm2 Please suggest me sir

1929


what is meant by k-rating in isolation transformer?what is k9, k14 stands for?

2763


what is the use of permanent magnet generator in exciter

2149


How to select HT/MV cable size ?

2460


What is a slack bus?

1137


What is the differance between 2 dc motors of armature voltage 660 v and 440 v?

1967


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2809


what will be d.g. capacity to cater together for 14hp A.C. load & 3kw lighting load

1988


Difference between ac parallel circuit and ac series circuit?

2109


During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.

1936


What are the three constants associated with a steady state error?

1209


Do any one know exacatly when the results for NHPC held on 8th march 09 for engineering trainees will be released ?. if so please post it, i'm eager to know it.

2145


can any one provide me a connection wiring diagram for a DG set control panel along with BOM?

2200