what is system requirement(SR) & business requirement(BR)?

Answer Posted / chandrasekar

SRS(System Requirement Specification): What are system
specifications we need to use in the project. A Senior
Technical coordinator will prepare the document.

It covers, What is the os we need to use , and what are the
RDBMS, what are the OLAP tools, RAM capacity.

All the requirements are mentioned in this document.

BRS(Business Requirement Specification): The business
analyst will sit together with business managers and prepare
the business requirements and documented in the word format.

Business analysts and business user community people will
prepare the Business Requirement specification.

This document will forwarded to next phase for designing.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is a predefined event?

654


How many ways are there to do 'remove duplicate records in informatica'?

581


Whats there in global repository

1260


Why is sorter an active transformation?

659


What are the different ways to implement parallel processing in informatica?

856






Explain the mapping variable usage example in informatica

629


I want my deployment group to refer an external configuration file, while i deploy in the production environment. How can i achieve it.

1576


Which transformation is needed while using the Cobol sources as source definitions?

723


What is a repository manager?

644


What are the settings that you use to configure the joiner transformation?

611


What are the different types of transformation available in informatica.

630


What is the function of look up transformation?

645


In how many ways we can create ports?

697


Can you generate sequence numbers without using the sequence generator transformation?

595


write a query to retrieve the latest records from the table sorted by version(scd)

629