Answer Posted / amit patel

SCAN time of DCS /PLC defines as execution of one cycle of
program (reads the inputs, executed whole program and
writes output)

Normaly DCS scan time are 200msec ,500msec,1 sec
PLC scan time are less than 100msec.

Is This Answer Correct ?    21 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what effects a surging can produce in the compressor

1468


I wnat to practice more online type questions .so will you show them me to take a practice test?

918


what is loop1 and loop2 in MTS LT?

4186


anybody having Qatar Petroleum questions for instrument Technician offshore ....please send me

5548


Why is the orifice tab provided?

704






What is stripper & spilitter ? Diffrence in this.?

2530


Dear Friends, we are planning to design Power distribution and Fiber optic in the same cabinet.Like Front side Fiber optic and Rear side Power distribution.Is it any possibility of problem occurs like interference etc? Your answer is highly appreciate.

1739


How can we test a bently nevda 3500/42M accelerometer monitor card by simulating it with test equipment?. what king od of signal (milli volts or volts or or resistance ) we should feed in the terminals of the card?

2005


what does it mean an active front end in vfd plz explain it briefly

1400


can u briefly explain aboutan aryton shunt multirange DC ammeter?

2297


How INtools is useful for routine Instrument maintenance?

1564


A PLC is programmed to drive three motors A, B and C as follows : After running motor A for an hour, motor B should get ON and motor A should get OFF. And after running motor B for an hour, motor C should get ON and motor B should get OFF. And after running motor C for an hour, motor A should get ON and motor C should get OFF. (That is, a cyclic repetition with time period one hour) Now, the second condition is: If any motor gone faulty and is tripped, the consecutive motor should get ON and the faulty (tripped) motor should be eliminated from cyclic repetition. The remaining two motors should bear the cyclic repetition of one hour each. (For healthy motor take logic as high and for tripped motor take logic as low) Now, the third condition is: When motor A load(Amps) exceeds 60% of its rated load, motor B should get ON in parallel to motor A. And when both motors A & B are running in parallel, and if their load exceeds 60% of their rated load, motor C should also start in parallel to A & B. [Here the cyclic repetition is eliminated, until their loads become normal(40%)] [Take logic high(1) for load at 60% and logic low(0) for load at 40%] Now draw a flow chart or a ladder diagram to fulfill the above condition.

1684


Difference between ultra sonic flow meter

1549


What is the PLC configuration in Cement industry?

3264


What are the charcterstics of a P&ID controller block for Governor speed raise or lower for a load sharing functionality between 4 Gas turbines in droop mode.

2495