What is the basis of choice for cement sand plaster in ratio
1:4 and 1:6 on interior walls of a residential apartment.
Answer Posted / mahendra mohan srivastava, acc
As you know that 1:4 is rich mortor behalf of 1;6, because
1:4 has 1 part of cemet and 4 part of sand, and in 1:6 has
1 part of cemet and 6 part of sand, so same cement contant
but more sand shown that the fine partical more. so when
fine parical more it wants more water, and if we add more
water in same cement contant the strength will reduce. so
in between 1:4 and 1:6, 1:4 is more power full, instred of
1:6.
now interior wall and Outer wall, outer wall is facing more
climate effect, like rain wind etc.
so we use rich morter in outer wall.
| Is This Answer Correct ? | 42 Yes | 1 No |
Post New Answer View All Answers
What are some structures that may be subjected to fatigue?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
Explain what is 1/8 on the architect ruler denotes?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
What is the general specifications of a bituminous pavement road?
what is flashing?
How to compute minimum number of columns required for a site from area of site?
I what know about life time of frp tank plz explain about it specifications & other details
what is the dimensions of river sand truck trailer or trolly ?
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.