What is the basis of choice for cement sand plaster in ratio
1:4 and 1:6 on interior walls of a residential apartment.
Answer Posted / ahmed
1:4 ratio will be for internal walls
| Is This Answer Correct ? | 5 Yes | 18 No |
Post New Answer View All Answers
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
How many bricks are there in 100cft?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
pls mail some more tecnical qustions at msaranya2610@gmail.com
What is absolute pressure? How absolute pressure is calculated?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
What are the methods of measurement? Describe it shortly
how to take concrete quantity for precast segment for viaduct project?
What is braced excavation all about?
what's the formula for calculate pcc for matt(45mm aggregate)?
What are the phases inspections are done by local authority while construction?
How to calculate the weight of sand am 20mm course aggregate in 1 c.m M25 concrete Which use 400 kg of cement ?
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
What is horizon or horizontal mining?
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.