Answer Posted / r.subrahmanyam
AB switch means which is used to break or close the Power circuit Near Load location or any Linew, Substations or where ever we want.
| Is This Answer Correct ? | 10 Yes | 4 No |
Post New Answer View All Answers
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
Explain marx circuit.
A 3 phase transformer's (Y-Y) Y and B phase is (Y and B connection not broken) broken from neutral and R and Nutral connection is ok, what will be the relay tripping and why
What is the Minimum winding resistance of motors ( small & big)? referance range
High speed earth switch operation with diagram
Define steady state error.
which motor have relatively high power factor and what is reason for have high pf? 1.capacitor run motor 2.shaded pole motor 3.capacitor start motor 4.split phase motor
i installed 100kva ups. what KVA genset they should provid in input side? plz any update formula or ans with reason.
There is any especial requirement for motor to drive through with VFD?
what is difference between window type and wound type transformers?where we will use window type and wound type transformers?
I am B.E.electrical engineer having 7 years of experience in Transformer testing upto 315 MVA.I want to khow how I can get the 'Electrical Valuer' License.
1.how many earth pits are required for 1000 k.w plant include substion , transformer ? 2. how many earth pits are required for 500kva generator.what is formula to calcute?
Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!
my UPS suddenly goes off and all panel light also blow off.This happens even main electric supply is not interrupted.After some time it automatically starts functioning normally.Batteries are new.
why booster transformer is used in sumpners test conducted on transformer????