DG B-check,C-Check,D-check is depending upon the running
hrs.If the running hrs is not reached as mentioned.How to
conduct the DG checks.
Answer Posted / sharath patel
if the running hours not reached means we can conduct the
checks by the number of days from the comissioning date.
| Is This Answer Correct ? | 7 Yes | 9 No |
Post New Answer View All Answers
A double circuit with dog conductor 66KV Transmission line from wind farm evacuation to feeding substation having capacity of 25MW for transmission. Can same transmission network be considered for further expansion of Power & how much in MW. If we need to expand next 10-15 MW more will there any augmentation is required in transmission network? Kindly reply asap.
how many current required for hypo test
How to use computer cpu ups use for home inverter circuit board
What magnetic circuit is formed in berry-type constructions and why?
How to calculate cable rating for 3 phase supply?
is it value of power factor is more than unit. whats effects in the source supply
for compensate 315mh inductance ,how many capaciance required?
Why do we use copper cable for HT Supply and why not Aluminium?
for a 500 KVA connected load, I calculated 30% of capactor for power correction. Even after using 225 KVR capactor PF is not improving. What could be reason for low Phase correction factor?
which is the best institute for PLC,SCADA,DCS in hyderabad
Grid fault level [KA]?
how ups works ? various parts of ups and working principle
CPC cable .PVC \1C....I want to get sure that type is flexible indoor or to be install on trench. please advice .thanx :)
How DC earth leakage currents can be reduced ?
What is the need of generator relay panel