how much binding wire is required for one tone steel

Answer Posted / @@@@@

wire cannot be actually said how much required for 1ton or
2ton, it actually depends on the design given to in which
the spacing varies so wire required also varies for column
footin and slab. u can just assume a small quanity of wire
to avoid wastage.

Is This Answer Correct ?    3 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

1561


What is Gsb tollens ?

1530


How is calculate the cube molt

1792


how u design STAGING for Superstructure in BRIDGE construction?

1892


is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.

1920






Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.

1256


do we decide reinforcement steel , based on bending moment ? give example with continous slab?

1947


All aptitude question of Bechtel

1421


How we calculate the service time of buildings

1426


what is the difference between replacement of cement by groundnut shell ash

2510


Explain what is the release of lien?

659


What are the advantages of cad software’s?

680


How to calculate laplength for 3 floors

1347


What is absolute pressure? How absolute pressure is calculated?

673


what's the formula for calculate pcc for matt(45mm aggregate)?

2159