how much binding wire is required for one tone steel
Answer Posted / @@@@@
wire cannot be actually said how much required for 1ton or
2ton, it actually depends on the design given to in which
the spacing varies so wire required also varies for column
footin and slab. u can just assume a small quanity of wire
to avoid wastage.
Is This Answer Correct ? | 3 Yes | 8 No |
Post New Answer View All Answers
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is Gsb tollens ?
How is calculate the cube molt
how u design STAGING for Superstructure in BRIDGE construction?
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
All aptitude question of Bechtel
How we calculate the service time of buildings
what is the difference between replacement of cement by groundnut shell ash
Explain what is the release of lien?
What are the advantages of cad software’s?
How to calculate laplength for 3 floors
What is absolute pressure? How absolute pressure is calculated?
what's the formula for calculate pcc for matt(45mm aggregate)?