wire cannot be actually said how much required for 1ton or
2ton, it actually depends on the design given to in which
the spacing varies so wire required also varies for column
footin and slab. u can just assume a small quanity of wire
to avoid wastage.
| Is This Answer Correct ? | 3 Yes | 8 No |
Post New Answer View All Answers
what is the specific gravity of rubble in plum concert
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
400 ku d/c clearess ketan hota hai?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
What are advancements in civil engineering?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
what is meant by residual strain?
Doul Bar reinforcement and details of drawing.
What is reinforced concrete?
Calculation of Pier Cap with tapper area?
how to check and keep control on the wastage of material at site
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???