Answer Posted / prabu
In some situation requirements might be change in the sense
dynamically,so after build the project completely some more
requirments may come from user side at the time if we
include those requirements in side the already build
project it will come to the testing phase ,in that
situation need to go through regression testing,just check
whether the new requirements have affected any other
modules present in the project... that to say in a simple
words the output from the change request would affect the
other modules or not.......
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is mean by impact analysis ,how we used to select regression TC using this?
how will we change the server system time?
What are the different ways to check a date field in a website?
What exactly is quality control? Is it similar to quality assurance?
What are the interview question on insurance domain in manual testing
what is mean by Performance Related Testing in data base?
What r the features,u take care in prototype testing?
what is port testing and do it comes in manual testing?
What is function points??????
What is the difference between functional requirement and non-functional requirement?
hi experts, i was asked to write down the requirement description,test scenario, and test cases for gmail login and send email and then to check the email was sent in the sent mails.the format given to me was like this: Req ID, Req description, Test Scenario, Test cases....Can anybody please help me out with this..
need testing projects where can i find them
Why is software testing required?
What is Difference between Test Strategy and Test Methodology?
List the considerations in developing testing methodology