why compression strenth of concrete is tested with a cube of
size 150x150x150 mm ?
Answer Posted / sanjay tewatia
the test on this dimension is done because it is specified in is coding system, and also because the varieing pressure of concert will not rises in less then the 100mm area and it will not give the actual positioning of the spreading area and to varies the whole strength of each substance mixed in it to give its full volume
| Is This Answer Correct ? | 7 Yes | 5 No |
Post New Answer View All Answers
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
how to calculate steel for slab or footings?
What is the difference between one-way slab and two-way slab?
What does a construction cost covers and what does not?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
How to calculate the force on a column of three story building. What should be the base concrete height?.
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
Why we provide hair pin for shed
what is labour consume factor in residential projects
as per is code, what is the minimum content of opc and ppc cement for rcc structure
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
How much cum. Brick work can do by 1 madon
why the openings of sieves are square io size?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
how many running meters in one kilogram of 4mm pvc coated chainlink fencing