Answer Posted / raju msra
a stub column is column which does no have any base which provided only for stiffness purpose of the member.
| Is This Answer Correct ? | 55 Yes | 30 No |
Post New Answer View All Answers
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
How long does it take concrete to harden?
I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
what is polity
what will be price of 1:2:4pcc per kg?
what is the hanekom repairing material after concreting work
how to check and keep control on the wastage of material at site
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
Define What is the tensile strength of wood?
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water
What is the significance of cost estimate knowledge for an architect?