what is principle of DC machines?
Answer Posted / raja
2 principles
1 is hetropolar
In the case of a hetero-polar generator the
induced emf in a conductor goes through a
cyclic change in voltage as it passes under north and south
pole polarity alternately.
2 is Homo polar
Even though the magnetic poles occur in pairs,
in a homo-polar generator the conductors
are arranged in such a manner that they always move under
one polarity. Either north pole
or south pole could be used for this purpose. Since the
conductor encounters the magnetic
flux of the same polarity every where it is called a homo
polar generator.
| Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
how we start 40w tube light with 4 diodes,2capacitors,1 choke and without starter.(a product avilable in market which lights burnt tube lights also)
i am gng to visa interview this july i have 4 backlogs gre 1010,toefl 75,pls give me the tips pls pls
Can you tell me more about pu systems (per unit systems )calculation in large power systems? how to get the base for voltage and power in generator, transformator and transmission lines?
What is the restart inhabit setting in ABB spam150c relay (Motor protection relay)
why need to be maintain power factor for industrial customer?
WHAT IS SPEC OF CLEANROOM MOTOR AND LIGHT FITTINGS?
WHY RATING OF VCB NOT LESS THAN 630A
HOW TO SET THE EARTH FAULT SETTINGS IN ACB????????????
WHAT IS THE WORKING PRINCIPLE OF A GENERATER.how is a GTG (Gas TURBANE Generater) working.plz explane
c++ write a program to use a fuction call "max"which accepts an intger arrey of size5.as an arrument and return the larger and smallest of the arrey to main without changing. the original changing of the original position of the element of the arrey.
If two Transformers are connected in parallel having impedance of 50KA in both transformers will the impedance increase or decrease after connecting transformers in parallel?
During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.
In siemens S7-300 PLC, what is function and function block ? What is the difference between them ? When to use function and when to use function block ?
Why electrical power generation and transmission done in 3 phase system not more than 3 phase ?
In Designing the rating & accessories of a MCCB how to choose the type of releases..means what is the basis for selecting, thermal magnetic, electromagnetic & microprocessr based releases