Answer Posted / hemant baviskar
MRP type determines whether and how the material is
planned.For different requirement the different types are
available in SAP. "PD"for exploding the BOM & generate the
requirement."VB" for manual reorder point,"VM" for
automatic reorder point. etc.
| Is This Answer Correct ? | 123 Yes | 17 No |
Post New Answer View All Answers
Difference between Manual reorder point and Automatic reorder point.
What is Individual and collective requirements and differecne between them in MTO scenario?
Define 'sop' (sales & operations planning)?
In project the customization is comes under which phase?
what are the settings needed for variant configuration?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
Explain about rough cut planning
What are all the steps involved in Variant Configuration?
How the process time is calculated in a wc when both labour, machine categories exist?
What is the use of t-code cs20 in bom?
What is internal payroll process?
what do you mean by planning time fence
Explain the stock requirement list and their uses.
What do we do in realization phase?
What is mrp group and what is the use of it?