how to calculate the steel for rcc slab?
plz tell me the formula for calculating the steel?
Answer Posted / luke
The above are to design steel requirments in a slab.
However to calculate amount of steel in a slab u simply need
drawings. A simple assumtion of 10d (i.e:- 10 * diameter )
is ok for bent up calculations.
| Is This Answer Correct ? | 12 Yes | 5 No |
Post New Answer View All Answers
what is floating slab foundation?
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
what does the grad of cement shows (denotes)?
Does VDF add strength to the flooring apart from preventing water ingress?
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
what is conrete grade ,how are depent on concrete grad and size of concrete?
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
What are the steps involved in the concreting process?
at what pressure ply-wood is obtained by gluing wooden sheets
List out the types of roofs?
Why are pull-out tests performed for soil nails?
What is rate for brick masonry work of 1.0 m3 in cm 1:6?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
How to calculate the load of partion in flat slab if we use brick?