Difference b/w SCADA & DCS

Answer Posted / vijay krishna

dcs is an electronic unit which performs the task
according to our programme.all inputs are given to it and
it delivers the output according to our logic written.

where as scada is just a software which will take the
inputs and outputs from dcs and shows in a pictorial form
which we have to develop it is only to moniter for the
process control.

Is This Answer Correct ?    0 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Sir, I am working as a Instrument Engineer in Grasim Industries. Can any body provide question answer for interview purpose

1655


Why even multiple power supplu r used in instrumentation system?

4114


Explain operation of Haskel pump.

1521


What is zero elevation and zero suppression?

1586


wich is coming the first HAZOP OR SIL

2297






send me HPCL paper

8277


selection criteria of control valve? and selection criteria of actuator explain in brief?

3632


Draw a great bridge circuit.

1553


what is interface level measurement.who can calibrate interface level measurement transmitter online

1968


Can anyone send most commonly asked interview question in Oil & Gas industry

1737


how u calibrate sox nox co2 co in cemps?what is opacity n HPm?tell the standard parameters of cems?

3172


what is The specifications for oriface instalation

1585


can anyone tel the syllabus or previous year question paper for BHAVINI(EIE)2014.

1923


What is the right procedure for adjusting the gap voltage of bently nevada vibration sensor?

14335


If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , so what to do for solve this problem. The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?

1604