How to declare the more than one file in cl/400.
Answer Posted / mathan kumar
DCLF FILE(DSP101) RCDFMT(SCR1)
DCLF FILE(DU) RCDFMT(SCR1) OPNID(OPN)
SNDRCVF RCDFMT(SCR1)
SNDRCVF RCDFMT(SCR1) OPNID(OPN)
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What are the types of identifiers?
How can we know running job is batch or interactive?
When we have a file with Duplicate records and I want to read the unique record from the file. For example a file containing Emp Name as 'Ram' and there are 3 entries of it. So how to read a unique record from File?
How to handle duplicate error handling in RPG?
if there is a module object , how to find the program object for this module object.Assume the module object name and program object name is not same.
how do you use commitment control in rpg?
how can I tell when to replace the array?
explain sflclr, sflend, sfldlt, and sflcsrrrn?
can I touch the array during treatments?
Q:HI friends accually ihave one problem plesase let me know the alternate code of this code. Related field description of code: Add a field, CALvsPRD, "Calendar Day Starts Before/After Production Day" to the parameter set WRKORDER which accepts values 'A' or 'B' o B = Calendar Day Starts Before Production Day o A = Calendar Day Starts After Production Day o Any other value indicates the production and calendar dates are always the same. code: Automatic Execution Of *INZSR Subroutine /Z01 * retrieves WRKORDER field values. /Z01 * Calculate default Production Date and return it to caller. /Z01 * Production date defaults to system date /Z01 C Eval P@Pdate = %DATE() /Z01 * unless Calendar date starts Before PDN(production) date and /Z01 * system time is before PDN Start Time then /Z01 * PDN date is yesterday. /Z01 C If W@CALvsPRD = 'B' and /Z01 C %TIME() < %TIME (W@Strtime) /Z01 C Eval P@Pdate -= %Day(1) /Z01 * unless Calendar date starts After PDN date and /Z01 * system time is *GE PDN(production) Start Time then /Z01 * PDN date is tomorrow. /Z01 C ElseIf W@CALvsPRD = 'A' and W@Strtime > *Zero and /Z01 C %TIME() >= %TIME (W@STrtime) /Z01 C Eval P@Pdate += %Day(1) /Z01 C EndIf /Z01 C Eval *InLr = *On
what is the rpg system?
Assume 2 users are using the same file and first user updates some record in the file. Will the 2nd user will be able to see the updated record or not?
what is the procedure and explain about real time scenario.
how do I play {insert rpg system here}?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.