how can create a report like if the salary>50,000 display
balance,if salary<50,000 display green?
Answer Posted / palzkumar
Kasturi is right, we can achieve this using conditional formating
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What is difference between primary key and unique key constraints?
What errors and types of errors you faced in Cognos ReportNet?
What is drill down and slicing and dicing whats the difference between them?
When we save a report in report studio with what extn it save?
how to test reports in cognos?
what is hints in cognos and where we use it.
What is a Folder?
What is defined as catalog and types of catalogs in Cognos?
2. What functional area you worked on.
how you migrate reports to cognos 8 from previous versions?
what are all the versions of cognos and cognos8 as well as mention all the advantages nd disadvantages in cognos8 versions. any one plz answer this question.
can anyone let me know some tips or interview questions on framework manager metadata modeling, creating joins, and all other aspects related to Cognos 8 framework mgr
I have created a database "TestingDB" in MS SQL Server 2005. I have set the port properties and the Cognos Service is up. But I don't see anything in the Cognos. In the administration i have set the ODBC connection and it tested successfully.If i copy the samples to the appropriate directory then i can see the samples.But I don't know how to do the same thing with my own database "TestingDB". As i have configure the cognos in my company which is having a database (very near to production database).I am a novice in cognos. Please help me out.
What is meant by Reportstudio shortcut?
which type of project we r going to snowflake schema