can we half project in parallel jobs and half project in
server jobs?
Answer Posted / n
No
| Is This Answer Correct ? | 2 Yes | 9 No |
Post New Answer View All Answers
Have you used Unstructured data?
Enlist various types of routines in datastage.
What are the steps required to kill the job in Datastage?
Differentiate between hash file and sequential file?
Why do you need stage variables?
Name the different sorting methods in datastage.
What are the repository tables in datastage?
How to reverse the string using unix?
What is the difference between account and directory options ?
Highlight the main features of datastage?
Hi guys, Please design a job for dis requirement with derivation(solution). my source table like dis. emp_no qualification 1 a 1 c 2 a 3 c 3 b To loaded to target like dis emp_no qualification 1 b 2 b 2 c 3 a my requirement is every employer have three qualifications i.e a,b and c. what qualification missed in source table that will be move to target systems. Hope u got it the requirement. Right Thanks.
how can we create rank using datastage?what is the meaning of rank?
What are the components of ascential data stage?
How do you run datastage job from the command line?
how to connect source to db?generally what r stages u used? how to find the data is having delimiter format?