above is correct but the ct is current transformer for
measuring current and pt is measuring voltage in
sub-stations.these are using in HT sub stations only 1100v
and above.
| Is This Answer Correct ? | 11 Yes | 6 No |
Post New Answer View All Answers
What is called grain-oriented laminations?
What will be the voltage regulation of a full load and 0.80 power factor lagging load transformer when a two winding single phase transformer has a voltage regulation of 4.5% at full load and unity power factor?
HOW DOES THE ELECTRONIC ENERGY METER WORKS?
what is the difference between oil surge relay and buchholz relay.
what is difference between 2 pole structure and 4 pole structure in transformer yard
how many safety really of DG sets.
What are steps to be taken while designing of DYN11 distribution transformer to achieve magnetising balance?
sir, i'm preparing for hpcl exam officer trainee pls tell me how the exam ques paper pls pls
what is meant by 2 within a star in a voltmeter dial?
What are :- AC Distribution Board (Single & Double Front) DC Distribution Boards Distribution Board LT Breaker Panel.
is there any role of power factor with frequency variation? and how we can manage the frequency variation?
what is meant by twilight switches 7 where its applicable ?
What is different between Difnit time and instatous over current relay
What is value of earth resistance required for substation and equipment earthing and what are the reference guidelines
What is different bewteen low or high impedance busbar protection scheme