how to calculate the steel for rcc slab?
plz tell me the formula for calculating the steel?
Answer Posted / b.narayana murthy
For estimation purpose , the quantity of steel will be 120
kgs x rcc quantity
| Is This Answer Correct ? | 17 Yes | 18 No |
Post New Answer View All Answers
Permissible wastage of cement as per IS code ? In which IS code I get it?
IS code for grade of concrete for bamboo lintel????
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
what is civil enginnering & what you need of this course?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
How to fix toll charge for a particular vehicle at toll booths in a highway?
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
Design a rectangular channel.
if i used salt as a add mixture in concrete, then what will happen and what are the naturally available add mixtures.
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal