Have a join logical file with more than one members with
different record formats. So how can we read the different
members from this file and also how we can read the
different record format from the join logical?
Answer Posted / sarath
hi i am not able to find the extmbr in my f spec pls advice
if i am wrong.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Program to read marks of 10 students for 4 subjects and compute and display total marks and status of each student in rpg
What is the purpose of record level identifier?
is this a rpg channel?
can anybody help me to solve this problem. the program that i m checking display error message saying "Record format for file AJDSPFFD does not match model file and decimal error. how to solve this problem. The AJDSPFFD is snapshot the AJTLOG that is the audit trail list.
what is file information data structure?
how do I declare a minor?
1. What is bound-by-call and bound-by-reference? 2. Where and why is *Nomain used? 3. What are the difficulties faced by programmers when using service programs? 4. Explain the different ways of parsing and compiling XML in iSeries.
Please tell me how to read the records from a file with load an array of size with error conditions(The logic answer for this question is ARR is array of 99 elements Z-ADD 0 IDX *LOVAL SETLL FILE READ FILE 99 *IN99 DOWEQ *OFF IDX ANDLT 99 ADD 1 IDX MOVE FIELD ARR,IDX READ FILE 99 ENDDO).So,Please give me the complete of this code.
can you debug ile rpg program using isdb?
How do u design a physical file, when you have 2 Unique fields like for eg in A student file student ID and student examination no both are unique
what is kids-rpg?
what are the key words you must use when using a subfile?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
Hi Viewers can any body explain me how to update and ahange the already existed data in physical file using subfile ? please explain me with the code if possible?
how does the rpg element work?