what is difference between Plan and Package
Answer Posted / swapnil
PLAN IS A EXECUTABLE CODE FOR COBOL.
PLAN IS A COLLECTION OF PACKAGE AND IT IS OUTPUT OF
BIND PROCESS.
PACKAGE: PACKAGE CONTAIN ONE DB REQUSET MODULE(DBRM)
AND IT IS NOT EXECUTABLE MODULE.
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
What is dbrm? When it will be created?
Which are the db2 tools to protect integrity of the database?
How do I connect my db2 database to ibm?
What is dclgen in db2?
How will you return the number of records in table?
In case if at some point of time db2 is down, would that impact the pre-compilation process of a db2-cobol program?
What are db2 tables?
Mention the length of physical storage of the given data types of db2 – date, timestamp, time
On which levels locks can be applied?
What are db2 objects?
What is null indicator in db2?
Explain db2.
What is blu acceleration in db2?
ther r 2 tables OTTABLE & SALTABLE, add the otamt from OTTABLE to empsal of SALTABLE if eid is matched else add the unmatched from OTTABLE to SALTABLE
What are the 2 sqlcodes that are returned?